|
× |
|
Hand Tools |
$119.00 |
|
$119.00 |
|
× |
|
100mm Floor Waste |
$33.16 |
|
$33.16 |
|
× |
|
Lighting (Allowance) |
$3,500.00 |
|
$3,500.00 |
|
× |
|
Concrete |
$39,255.00 |
|
$39,255.00 |
|
× |
|
Septic System (Allowance) |
$5,500.00 |
|
$5,500.00 |
|
× |
|
Plumbing |
$8,170.00 |
|
$8,170.00 |
|
× |
|
Plumbing Fixtures (Allowance) |
$5,897.00 |
|
$5,897.00 |
|
× |
|
Exterior Doors &Windows |
$23,213.00 |
|
$23,213.00 |
|
|